Source
Dwarkesh Podcast — What will computer chips look like in 2045? (October 22, 2026) ·
at 47:03 ▸ ·
at 49:39 ▸
When this applies
when a whole industry's growth depends on a small number of shared, slow-to-scale upstream suppliers, regardless of how much capital any single player deploys
The takeaway
When growth depends on a shared, concentrated supplier base with long lead times, capital alone cannot bypass the bottleneck; near-term output is capped at roughly the increment the whole supply chain (not just your own spending) can support.
Why it works
Once a process is locked into a specific tool, substitutability disappears, and because all industry players draw from the same limited supplier base, no amount of capital from one firm expands the total pool of available tools in the near term — capacity expansion is gated by the slowest-growing upstream link in the entire supply chain.
One level up
Identify whether your bottleneck is capital-constrained or supply-chain-constrained — these demand entirely different strategies (spend more vs. coordinate or wait on upstream suppliers).
Where it stops holding
This stops working when alternative tool suppliers, tool-sharing fungibility across nodes, or increased supplier output genuinely expand total available capacity faster than currently projected.
Detail
rule: Even with infinite CapEx, output from a given leading-edge process is capped at roughly 2x current levels given existing tool-supply constraints, not 10x.
threshold: ASML produces under 100 EUV tools/year, shared across Intel, TSMC, Samsung, and memory makers like SK Hynix; yield improvements beyond already-high yields are 'extremely hard' marginal gains.
rationale: Once you lock into a process flow, you're locked into a specific tool and supplier; the AI industry's historical 3x/year compute growth cannot continue unless the entire supply chain — equipment makers, their suppliers, their sub-suppliers — collectively ramps output.
In their words
Are there enough tools in the world so you get 10x the amount of wafers you're producing at the leading edge? Not 10x, but probably like 2x, yes.